1
/
of
4
Uploader
Case 580N EP Backhoe Loader Service Manual Workshop Guide
Case 580N EP Backhoe Loader Service Manual Workshop Guide
Regular price
$37.00 USD
Regular price
Sale price
$37.00 USD
Unit price
/
per
Taxes included.
Shipping calculated at checkout.
Couldn't load pickup availability
Manual Included:
•
Service Manual:
2386 Pages & 2999 Pages
Specifications:
•
Brand:
Case
•
Model:
580N EP
•
Type:
Loader
•
Manuals:
Service Manual
•
Publication Numbers:
448194542 (Nov 2017) & 47830957 (Oct 2015)
•
Language:
English
•
Format:
PDF
Description
Table of Contents
Content
Introduction
Engine
Transmission
Four Wheel Drive System
Front Axle
Rear Axle
Hydraulic System
Brakes and Controls
Hydraulic System
Frames and Ballasting
Steering
Wheels
Cab climate control
Electrical System
Front Loader and Bucket
Platform, Cab, Bodywork and Decals
Special Tool Index
Electrical Schematics
Hydraulic Schematics
Manual Extract: Speed gears shift rails adjustment
The speed gear shift rod position adjustment is only required if one of the following elements has been replaced: shift rail, control fork, synchro, gearbox, secondary shaft, and/or the relative gears.
All measurements will be in millimeters.
NOTE: At this point all bushings, screws, and shims are removed from the gear shift rods. To determine the required shims for the proper gear shift rod adjustment you must follow these procedures in order; the rear engagement bushing shim measurement, the front engagement bushing shim measurement, the piston bolt shim measurement, and the measurement in the neutral position.
NOTE: The following procedure shows the gear shift rail adjustment for the 3rd/4th gear shift rod. The procedure is the same for the 1st/2nd gear shift rail except you would use preload measure tool 380003427 instead of 380003426 and preform the procedure on the 1st/2nd gear shift rail.
1. From the rear-side of the transmission, install the mounting shims driver tool 380003422 (1) on the 3rd/4th (3/4) gear shift rod.
2. On the front-side of the transmission, install the application load handle tool 380003425 onto the 3rd/4th gear shift rod.
3. Pull on the load handle tool 380003425 in order to apply a load of about 2 kg (4.5 lb) (gear engagement position).
4. Measure and document the calibrated length of preload measure tool 380003426 as dimension value (A). Example
calibrated length (A) = 115 mm (4.5 in).
NOTE: Use preload measure tool 380003427 when working on the 1st/2nd gear shift rail.
Share



